PIPE, BOILER
Package C400B- Zone 3 is implemented by Vien Duong under a contract from general contractor GS E&C – KOREA with the scope:
- Manufacturing and installation: 50,000 ID
- Control unit assembly: 150 sets
- Piperack – Support installation: 300 tons
The A1341 skid cluster /its piping replacement package was performed by Vien Duong under a contract from the general contractor POSCO E&C – KOREA with the scope:
- Skid assembly A1341, isolating operating pipelines, replacement and installation.

TYPICAL PROJECTS
We provide the best & highest quality services to individuals and businesses at home and abroad.

Nghi Son Petrochemical Refinery Thanh Hoa
Client: GS - KOREA/ GS - KOREA/ NGHI SON REINERGY PLANT - THANH HOA
Year of implementation: 2015-2016
Volume scale: 50,000 ID Piping Pipes, 300 tons of structures, pipe supports and 150 sets of static/dynamic equipment
Scope of work: Manufacturing, installation, force/seam testing, trial acceptance and commissioning, handover for official operation.