Search
Close this search box.

PIPE, BOILER

Package C400B- Zone 3 is implemented by Vien Duong under a contract from general contractor GS E&C – KOREA with the scope:

  • Manufacturing and installation: 50,000 ID
  • Control unit assembly: 150 sets
  • Piperack – Support installation: 300 tons

The A1341 skid cluster /its piping replacement package was performed by Vien Duong under a contract from the general contractor POSCO E&C – KOREA with the scope:

  • Skid assembly A1341, isolating operating pipelines, replacement and installation.

TYPICAL PROJECTS

We provide the best & highest quality services to individuals and businesses at home and abroad.

Nghi Son Petrochemical Refinery Thanh Hoa

Client: GS - KOREA/ GS - KOREA/ NGHI SON REINERGY PLANT - THANH HOA

Year of implementation: 2015-2016

Volume scale: 50,000 ID Piping Pipes, 300 tons of structures, pipe supports and 150 sets of static/dynamic equipment

Scope of work: Manufacturing, installation, force/seam testing, trial acceptance and commissioning, handover for official operation.

Installation of equipment and technological pipes - PV Gas Ca Mau Plant

Client: POSCO E&C / POSCO E&C / CA MAU GAS PROCESSING PLANT (PV Gas Cau Mau)

Year of implementation: 2019-2020

Mass scale: Skid assembly, static/dynamic equipment

Scope of implementation: Isolate the operating gas pipeline, carry out replacement, installation, force/tightness testing, trial acceptance and commissioning, handover for official operation.

CONTACT US

If you need to clarify any questions or cooperate, please leave your information below. We will contact you immediately .

Search
Close this search box.
Search
Close this search box.